Phased assessment

Guided IRAM 2.0 track — worksheets phase by phase with optional AI enrichment.

Phased is the guided approach: you work each phase with worksheets and prompts. AI enrichment is optional — choose Skip to stay on the free path. Screenshot tour: Phased walkthrough. Switch approach anytime: Choose your approach.

Spine

Same ten phases as every approach — see the shared product workflow. Riskonami assessment spine from Phase 1 through Phase 10

Steps on this track

  1. Phase 1 — Organisation
  2. Phase 2 — Architecture
  3. Phase 3 — Controls
  4. Phase 4 — Threats
  5. Phase 5 — Likelihood
  6. Phase 6 — Inherent risk
  7. Phase 7 — Treatment
  8. Phase 8 — Remediation
  9. Phase 9 — Residual risk
  10. Phase 10 — Report

Cost

Guided steps and Skip/manual paths are free. Affirmed AI enrichment costs 1 AI token per gate. Details: How billing works. Next: Screenshot walkthrough · Phase 1 — Organisation · Switch approach